Under powered

0
29
The Eye
Latest posts by The Eye (see all)
There are ‘headwinds’

Recent crisis news about the future of a large car battery firm, as well as problems facing Electric Vehicles (EVs) generally, strengthen doubts concerning a company which proposed a multi-million pound scheme for Wales, but was connected to a fraudster and had a dubious individual as a director.

The Eye were alone in first revealing that British Volt (BV) was established by a man convicted of tax fraud, and which ditched a planned site in South Wales, even though its proposals had been greeted with huge fanfare by politicians and reporters in the Welsh mainstream media.

Jobs are to go

Europe’s EV sector has been struggling as consumer demand for greener vehicles fails to increase quickly enough, and industry figures have revealed that the number of cars sold in the EU fell to 643,000 in August.

Reflecting this the Swedish battery maker Northvolt (NV) announced last month that it was to cut 1,600 jobs, in response to these ‘headwinds’. The company said it was making the redundancies across three of its sites, including 1,000 in Skellefteå, in northern Sweden.

Peter Carlsson has warned it’s a bumpy road ahead for Electric Vehicles

Peter Carlsson, NV’s boss, said there are “headwinds in the automotive market, and wider industrial climate”.

Carmakers, including NV’s biggest investor, Volkswagen, have had to cope with the poor economics of EVs as demand has slowed. NV lost $1.2 billion last year, four times its loss in 2022.

‘Electric Vehicles and British Volt are the way forward’

All of this puts centre stage the worries about BV’s £4 billion planned project in Wales.The firm was once touted by former Prime Minister Boris Johnson as a key part of his ‘green industrial revolution’, but it came close to collapse three years ago.

In the Sunday Times (ST) it was published:  “Britishvolt’s inevitable journey towards disaster has been, well, a very British story…The electric car battery factory planned for Blyth, near Newcastle (after Wales), had no customers and no products. One of its founders had no automotive experience. The other had a conviction for tax fraud in the 1990s. Britishvolt wanted millions of taxpayers’ pounds for its gigafactory”.

Lars Carlstrom – co-founder of British Volt and associate of a fraudster, didn’t wish to become a ‘distraction’

As this report alludes to, the UK Government had committed a total of £100 million worth of taxpayers’ money to BV for the venture, and it is understood officials there wanted to draw down nearly a third of the funding early, but it was refused.

The organisation’s original Chairman and co-founder, Lars Carlstrom, had been convicted of tax fraud in Sweden, and afterwards Chief Strategy Officer of BV, Isobel Sheldon, said the operation was severing all ties with him. Mr Carlstrom was also handed a four-year trading ban in the late 1990s. He was later, too, accused of acting negligently by Sweden’s tax authority over a separate unpaid bill for one of his companies in 2011. In leaving BV, Mr Carlstrom said: “I don’t wish to become a distraction”.

With this sort of background, the recent information about Northvolt as well as problems for the industry generally, came as no surprise to critics of BV, and as the website North East Bylines (NEB) had put it about Mr Carlstrom earlier: “He was the same individual whose track record had been queried by The Eye when reviewing the proposed location in Wales…”.

Neil Moore – ‘surprise’

Before BV plumped for a site in Blyth, it had first chosen one near St Athan, but there were worrying details here too.

Neil Moore, then leader of Vale of Glamorgan council, was hugely disappointed at their failure to come, and said: “They were given a better deal elsewhere. I was surprised when they pulled out”.

A battery firm’s plans for a site in the Vale of Glamorgan were abandoned

BV had apparently acquired the Blyth site over the Welsh alternative because of better connections to renewable power sources such as windfarms in the North Sea, as well as an interconnector to Norway’s hydroelectric power – with timing difficulties in Wales also a factor.

But as the report in NEB showed, our research featured in publications in the North East of England after the firm had declared that it would not, after all, build the St Athan plant in the Vale of Glamorgan and move to Blyth instead.

An uncannily similar design to the firm which is now cutting jobs

The website said: “In July 2020 this (the plans for the Welsh battery factory) seemed a welcome bonus for Wales and the prospects of a large new green manufacturing capability with thousands of jobs could only be good news. Except, however, when doubts were quietly raised by The Eye, an investigative news and journalism website ‘looking into misdemeanours by organisations and individuals in Wales and the UK’”.

Portsmouth FC was in the spotlight

The questions about prominent figures behind BV have long been persistent, while only our journalists have published them (apart from NEB, and some other mainstream reporters, like those on the ST). We had been the first to disclose that a key director possessed a failed business behind him, had links to a former football club owner who was jailed for fraud, and another one who until recently had lived in a small flat in a Cardiff terraced house.

Our research could find no record of any director having a background in battery manufacturing. The South Wales scheme, though, was met with wild acclaim in some media outlets and by senior politicians.

BBC Cymru Wales (BBC CW) proclaimed:  “The firm behind a proposed battery factory which could create 4,000 jobs has listed a site in Wales as its ‘preferred option’”. The website WalesOnline (WO) published: “Plans for a giant factory and thousands of jobs for the Vale of Glamorgan have been revealed. Battery manufacturer Britishvolt announced … that two sites are in the running for their factory, with Bro Tathan business park (near St Athan) leading the way”. It stated later:  “Plans for a factory producing electric car batteries that would bring thousands of jobs for the Vale of Glamorgan have moved a step closer.”.

To The Times it was ‘ambitious’

This was The Times:  Ambitious plans have been revealed for Britain’s first gigafactory capable of producing enough fuel cells and battery packs to power 100,000 zero carbon electric cars.

“The project in south Wales, which is designed to put the UK in the race to be a global hub for the electrified vehicle industry, comes from Britishvolt, a start-up company founded by a Swedish automotive entrepreneur best known as a former associate of (a) jailed Russian businessman. Britishvolt has unveiled plans to build a gigafactory capable of producing 10 gigawatt hours (GWh) of lithium ion batteries a year from early next year at Bro Tathan, on the Cardiff airport commercial complex where Aston Martin Lagonda has opened its new carmaking factory.”

To Simon Hart, MP, it was ‘fantastic’ that British Volt was considering coming to Wales before they ditched the plan altogether

The Secretary of State for Wales at the time, Simon Hart, said it was “fantastic that we can talk about Wales as being a leading contender” for the UK’s first gigafactory.

The venture in South Wales, though, was soon stopped by BV, yet crucial facts about the men behind it could have been easily discovered.

Investigations by our journalists at Companies House (CH) and elsewhere, disclosed that a prominent director of BV was Couroush (or Courosh) Alai who until recently had lived in a modest apartment at Lily Street in Cardiff, which appeared to be a terraced house converted into flats.

Mr Carlstrom, had been involved in a coach company at Coventry that was in debt to creditors for around £1 million. He had also been director of a watch manufacturer called Thrupp and Maberly which has now been dissolved. In 2011 it had first come to light that Mr Carlstrom was the “representative in Sweden“ of a man jailed for fraud.

At an extradition hearing, the former ‘representative’ of Mr Carlstrom, said that the charges against him were part of a politically-motivated plot. His father was shot and injured in Russia in 2009 over a suspected business dispute, and he claimed that he was at risk of attack in prison if he was sent abroad to stand trial.

British Volt’s Orral Nadjari wanted to come to Wales but pulled out

Meanwhile before the announcement that the new plant would be built in Northumberland as opposed to South Wales, BV’s ‘Chief Executive’ Orral Nadjari, declared:  “The first UK gigaplant will… be in an alternative location (to South Wales) which we will be announcing soon”. Yet Mr Nadjari claimed he had looked at more than 100 sites for the BV factory, before alighting on the former RAF site in Bro Tathan near St Athan.

Orral Nadjari, Ian Levy MP (centre), Lars Cartrom – ‘an incredibly exciting announcement’ for Blyth Valley

In the way the news of the ‘alternative location’ (Blyth) was welcomed, there would seem to be an uncanny echo of what happened in South Wales.

The Blyth Valley MPIan Levy, said at the time:  “This is an incredibly exciting announcement that will have a massive impact in the constituency and the surrounding area for decades to come”.

But the ‘massive impact’ is rather different – one where there is a huge crisis in the EV industry, and firms are cutting jobs…

 

Good reading material…

The memories of our Editor Phil Parry’s astonishing decades-long award-winning career in journalism when the interesting backgrounds of individuals were uncovered, as he was gripped by the rare neurological condition Hereditary Spastic Paraplegia (HSP), have been released in a major book ‘A GOOD STORY’. Order the book now!

Tomorrow – how even after 23 years with the BBC, and during a 41 year journalistic career, for Phil two key areas have always proved notoriously difficult – revealing corruption, and stories about wrong-doing in defence establishments, with the latter more and more in the news now.